Ethernet Cable Task

 Ethernet Cables Task 

 

The first thing I did was slit the cables to expose the twisted wiring. Then I untwisted the wires and ordered them in this order:  

 


The cables are then inserted into the RJ-45 connector, the wires are then put into the correct slots. Finally, the connector is crimped down and the cable is complete.  

Comments

Popular posts from this blog

Critical path analysis

Topologies

Emerging technologies allowing adaptability and future proofing